Install the new diode across the small posts on the solenoid, stripe to positive side.Install the new resistor across the large posts on the solenoid.Reconnect the batteries and confirm the controller works.Change the controller (some controllers may have adapter harnesses).Switch from run to tow if you have a switch.Take a photo of your existing wiring layout for reference.Larger controllers on series carts will also require an upgraded F/R switch. Larger controllers require a different solenoid, fuse and diode. This is for controllers rated at 400 amps or less. A 48v conversion will add approximately 30% or more for sepex carts to both speed and torque on your existing 36v cart.This write up is for both the series and the sepex cart.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |